Temp power permit in Rockdale County, Georgia
To get a temporary power pole (t-pole) permit in Rockdale County, you file an application with the Planning & Development through Magnet Gov permitting portal, pay the fee (typically $50–$110), and pass temporary service inspection. A temporary power pole/service to energize a site during construction — especially common on City of Atlanta jobs, which often pull it as a separate permit. Required to set a temporary service for construction before the permanent service is energized. Atlanta jobs frequently carry it alongside the general electrical permit. PullPermits.ai filing in Rockdale is on the way — join the waitlist to hear when it's live.
- Permit type
- Temporary Power Pole (T-Pole)
- Also called
- temp power, T-pole, construction power
- Where to file
- Magnet Gov permitting portal
- Typical fee
- $50–$110
- Turnaround
- 2–6 business days
When it's required
When you need a temp power permit
Required to set a temporary service for construction before the permanent service is energized. Atlanta jobs frequently carry it alongside the general electrical permit.
Typical scope of work
- Temporary pole, meter base, and disconnect
- Grounding and weatherproofing
- Georgia Power coordination for temporary service
Common rejection reasons
- Pole/meter height or grounding not to spec
- Filed under the wrong permit type
- Not paired with the required general electrical permit
Fees
Rockdale County temp power permit fees
Residential electrical permits typically run about $50–$110, plus a 2.95% card surcharge. Rockdale adds a 2.95% card surcharge, paid to the county with the permit fee.
| Charge | Amount |
|---|---|
| Rockdale County temp power permit feeTemporary Power Pole (T-Pole) permits typically run $50–$175 (Atlanta ~$175 per permit) statewide; Rockdale lands in this range. | $50–$110 |
| Card surchargeRockdale County adds this convenience fee — you pay it to the county with the permit fee. | 2.95% |
| PullPermits.ai markup on permit feesYou pay city, county, and inspection fees directly, at exact cost — no markup, ever. | $0 |
Figures are approximate. The city or county sets the final fee, and you pay it on its own payment page at exact cost.
Step by step
How to file a temp power permit in Rockdale County
The full process through Magnet Gov permitting portal.
- 1Confirm the jurisdictionResolve the job address to Rockdale County and confirm a temporary power pole (t-pole) is the right permit type for the scope of work.
- 2Prepare credentials and formsHave your active Georgia electrical license, business license, and insurance on file, plus a one-time notarized save affidavit.
- 3Draft the applicationDescribe the temp power scope — temporary pole, meter base, and disconnect — and attach any required documents.
- 4Review the fee previewCheck the fee breakdown ($50–$110 in Rockdale) before anything is submitted.
- 5File the application in Magnet Gov permitting portalSubmit the temporary power pole (t-pole) application and pay the Rockdale County fee.
- 6Track approval and schedule inspectionWait 2–6 business days, then book temporary service inspection.
Inspections
- Temporary service inspection
- Utility release
Once the permit is issued, you schedule these with Rockdale County.
Typical timeline
1–3 business days.
In Rockdale County specifically, plan on 2–6 business days.
You approve, we file
How PullPermits.ai will pull your Rockdale temp power permit
You stay the named applicant. PullPermits.ai drafts the temporary power pole (t-pole) application and files it through Magnet Gov permitting portal under your account — only after you tap approve. You pay the Rockdale County fee directly, at exact cost. Rockdale is on our rollout list; this is how it works in Atlanta today.
- Step 1
Describe the job
Tell us the Rockdale County address and the temp power scope. Your credentials are already on file.
- Step 2
Review the preview
See the full application and the fee breakdown in plain English before anything is filed.
- Step 3
Tap Approve & File
We file with Rockdale County; you pay its fee directly, at exact cost — nothing is submitted until you approve.
- Step 4
Get email updates
We track the status and email you each update until the permit is decided.
Rockdale temp power permit FAQ
- How much is a temporary power pole (t-pole) permit in Rockdale County?
- In Rockdale County, a temp power permit typically runs $50–$110. Residential electrical permits typically run about $50–$110, plus a 2.95% card surcharge. Rockdale County also adds a 2.95% card surcharge, paid to the county at cost. PullPermits.ai never marks up the city or county fee.
- How long does a Rockdale temp power permit take?
- 1–3 business days. In Rockdale County specifically, expect 2–6 business days.
- What inspections does a temporary power pole (t-pole) need?
- Typically: Temporary service inspection, Utility release. You schedule them with Rockdale County once the permit is issued.
- Anything specific about filing a temp power in Rockdale County?
- Runs on Magnet Gov; requires a one-time notarized SAVE affidavit.
- Why do temporary power pole (t-pole) permits get rejected?
- The most common reasons: Pole/meter height or grounding not to spec; Filed under the wrong permit type; Not paired with the required general electrical permit.
Keep exploring
All Rockdale County electrical permits
Fees, portal, requirements, and every permit type for Rockdale County.
Panel upgrade permit in Rockdale
Replacing or upsizing a home's main electrical panel and service — the most common residential electrical permit in metro Atlanta.
EV charger permit in Rockdale
Installing a Level 2 (240V) EV charging circuit — the fastest-growing residential electrical permit as EV adoption climbs.
Generator permit in Rockdale
Permitting a permanently installed standby generator with an automatic transfer switch — often paired with a gas permit.
Working a job somewhere else? Find your jurisdiction by address or read the temp power permit guide.
Be first when Rockdale goes live
Join the waitlist and we'll tell you the day PullPermits.ai starts filing Rockdale County temporary power pole (t-pole) permits.