PullPermits.ai

Temp power permit in Gwinnett County, Georgia

To get a temporary power pole (t-pole) permit in Gwinnett County, you file an application with the Department of Planning & Development through Accela Citizen Access (ACA), pay the fee (typically $50–$120), and pass temporary service inspection. A temporary power pole/service to energize a site during construction — especially common on City of Atlanta jobs, which often pull it as a separate permit. Required to set a temporary service for construction before the permanent service is energized. Atlanta jobs frequently carry it alongside the general electrical permit. PullPermits.ai filing in Gwinnett is on the way — join the waitlist to hear when it's live.

Permit type
Temporary Power Pole (T-Pole)
Also called
temp power, T-pole, construction power
Typical fee
$50–$120
Turnaround
1–4 business days for standard electrical permits

When it's required

When you need a temp power permit

Required to set a temporary service for construction before the permanent service is energized. Atlanta jobs frequently carry it alongside the general electrical permit.

Typical scope of work

  • Temporary pole, meter base, and disconnect
  • Grounding and weatherproofing
  • Georgia Power coordination for temporary service

Common rejection reasons

  • Pole/meter height or grounding not to spec
  • Filed under the wrong permit type
  • Not paired with the required general electrical permit

Fees

Gwinnett County temp power permit fees

Residential electrical permits typically run about $50–$120. Some permit types lack an online card-payment option and are handled separately.

What a temp power permit costs in Gwinnett County
ChargeAmount
Gwinnett County temp power permit feeTemporary Power Pole (T-Pole) permits typically run $50–$175 (Atlanta ~$175 per permit) statewide; Gwinnett lands in this range.$50–$120
PullPermits.ai markup on permit feesYou pay city, county, and inspection fees directly, at exact cost — no markup, ever.$0

Figures are approximate. The city or county sets the final fee, and you pay it on its own payment page at exact cost.

Step by step

How to file a temp power permit in Gwinnett County

The full process through Accela Citizen Access (ACA).

  1. 1
    Confirm the jurisdiction
    Resolve the job address to Gwinnett County and confirm a temporary power pole (t-pole) is the right permit type for the scope of work.
  2. 2
    Prepare credentials and forms
    Have your active Georgia electrical license, business license, and insurance on file, plus a notarized bps-06 blanket agent designation if filing as an agent.
  3. 3
    Draft the application
    Describe the temp power scope — temporary pole, meter base, and disconnect — and attach any required documents.
  4. 4
    Review the fee preview
    Check the fee breakdown ($50–$120 in Gwinnett) before anything is submitted.
  5. 5
    File the application in Accela Citizen Access (ACA)
    Submit the temporary power pole (t-pole) application and pay the Gwinnett County fee.
  6. 6
    Track approval and schedule inspection
    Wait 1–4 business days for standard electrical permits, then book temporary service inspection.

Inspections

  • Temporary service inspection
  • Utility release

Once the permit is issued, you schedule these with Gwinnett County.

Typical timeline

1–3 business days.

In Gwinnett County specifically, plan on 1–4 business days for standard electrical permits.

You approve, we file

How PullPermits.ai will pull your Gwinnett temp power permit

You stay the named applicant. PullPermits.ai drafts the temporary power pole (t-pole) application and files it through Accela Citizen Access (ACA) under your account — only after you tap approve. You pay the Gwinnett County fee directly, at exact cost. Gwinnett is on our rollout list; this is how it works in Atlanta today.

  1. Step 1

    Describe the job

    Tell us the Gwinnett County address and the temp power scope. Your credentials are already on file.

  2. Step 2

    Review the preview

    See the full application and the fee breakdown in plain English before anything is filed.

  3. Step 3

    Tap Approve & File

    We file with Gwinnett County; you pay its fee directly, at exact cost — nothing is submitted until you approve.

  4. Step 4

    Get email updates

    We track the status and email you each update until the permit is decided.

Gwinnett temp power permit FAQ

How much is a temporary power pole (t-pole) permit in Gwinnett County?
In Gwinnett County, a temp power permit typically runs $50–$120. Residential electrical permits typically run about $50–$120. PullPermits.ai never marks up the city or county fee.
How long does a Gwinnett temp power permit take?
1–3 business days. In Gwinnett County specifically, expect 1–4 business days for standard electrical permits.
What inspections does a temporary power pole (t-pole) need?
Typically: Temporary service inspection, Utility release. You schedule them with Gwinnett County once the permit is issued.
Anything specific about filing a temp power in Gwinnett County?
Gwinnett exposes a native 'Electrical Only' online permit type — fast when it fits.
Why do temporary power pole (t-pole) permits get rejected?
The most common reasons: Pole/meter height or grounding not to spec; Filed under the wrong permit type; Not paired with the required general electrical permit.

Keep exploring

Working a job somewhere else? Find your jurisdiction by address or read the temp power permit guide.

Be first when Gwinnett goes live

Join the waitlist and we'll tell you the day PullPermits.ai starts filing Gwinnett County temporary power pole (t-pole) permits.

We’ll only email you about PullPermits going live in your area. No spam.

Try the live demoThis is an interactive demo on sample data. Nothing is really filed.