PullPermits.ai

Temp power permit in Gwinnett County, Georgia

To get a temporary power pole (t-pole) permit in Gwinnett County, you file an application with the Department of Planning & Development through Accela Citizen Access (ACA), pay the fee (typically $50–$120), and pass temporary service inspection. A temporary power pole/service to energize a site during construction — especially common on City of Atlanta jobs, which often pull it as a separate permit. Required to set a temporary service for construction before the permanent service is energized. Atlanta jobs frequently carry it alongside the general electrical permit. PullPermits.ai drafts the whole application, shows you a preview with the fee breakdown, and files it with Gwinnett County the moment you tap approve.

Permit type
Temporary Power Pole (T-Pole)
Also called
temp power, T-pole, construction power
Typical fee
$50–$120
Turnaround
1–4 business days for standard electrical permits
When it's required

When you need a temp power permit

Required to set a temporary service for construction before the permanent service is energized. Atlanta jobs frequently carry it alongside the general electrical permit.

Typical scope of work

  • Temporary pole, meter base, and disconnect
  • Grounding and weatherproofing
  • Georgia Power coordination for temporary service

Common rejection reasons

  • Pole/meter height or grounding not to spec
  • Filed under the wrong permit type
  • Not paired with the required general electrical permit

PullPermits.ai checks for these before it files, so a Gwinnett temp power doesn't bounce back over a fixable detail.

Fees

Gwinnett County temp power permit fees

Residential electrical permits typically run about $50–$120. Some permit types lack an online card-payment option and are handled separately.

What a temp power permit costs in Gwinnett County
ChargeAmount
Gwinnett County temp power permit feeTemporary Power Pole (T-Pole) permits typically run $50–$175 (Atlanta ~$175 per permit) statewide; Gwinnett lands in this range.$50–$120
PullPermits.ai markup on permit feesCity, county, and inspection fees are always passed through at exact cost — no markup, ever.$0

Figures are approximate and verified against the city or county at filing time. The permit fee you see in your PullPermits.ai preview is exactly what the city or county charges.

Step by step

How to file a temp power permit in Gwinnett County

The full process through Accela Citizen Access (ACA). Or skip all of it: PullPermits.ai does every step once you approve the preview.

  1. 1
    Confirm the jurisdiction
    Resolve the job address to Gwinnett County and confirm a temporary power pole (t-pole) is the right permit type for the scope of work.
  2. 2
    Prepare credentials and forms
    Have your active Georgia electrical license, business license, and insurance on file, plus a notarized bps-06 blanket agent designation if filing as an agent.
  3. 3
    Draft the application
    Describe the temp power scope — temporary pole, meter base, and disconnect — and attach any required documents.
  4. 4
    Review the fee preview
    Check the fee breakdown ($50–$120 in Gwinnett) before anything is submitted.
  5. 5
    File the application in Accela Citizen Access (ACA)
    Submit the temporary power pole (t-pole) application and pay the Gwinnett County fee. With PullPermits.ai, you tap "Approve & File" and we do this for you.
  6. 6
    Track approval and schedule inspection
    Wait 1–4 business days for standard electrical permits, then book temporary service inspection. PullPermits.ai polls status and texts you each update.

Inspections

  • Temporary service inspection
  • Utility release

PullPermits.ai requests the inspection with Gwinnett County and confirms the appointment back to you by text.

Typical timeline

1–3 business days.

In Gwinnett County specifically, plan on 1–4 business days for standard electrical permits.

You approve, we file

How PullPermits.ai pulls your Gwinnett temp power permit

You stay the named applicant. PullPermits.ai drafts the temporary power pole (t-pole) application, files it through Accela Citizen Access (ACA) under your account, and passes the Gwinnett County fee through at exact cost — only after you tap approve.

  1. Step 1

    Describe the job

    Tell us the Gwinnett County address and the temp power scope. Your credentials are already on file.

  2. Step 2

    Review the preview

    See the full application and the fee breakdown in plain English before anything is filed.

  3. Step 3

    Tap Approve & File

    We file with Gwinnett County and pay the fee at exact cost — nothing is submitted until you approve.

  4. Step 4

    Get SMS updates

    We poll status, book the inspection, and text you each step to closeout.

Gwinnett temp power permit FAQ

How much is a temporary power pole (t-pole) permit in Gwinnett County?
In Gwinnett County, a temp power permit typically runs $50–$120. Residential electrical permits typically run about $50–$120. PullPermits.ai never marks up the city or county fee.
How long does a Gwinnett temp power permit take?
1–3 business days. In Gwinnett County specifically, expect 1–4 business days for standard electrical permits. PullPermits.ai tracks it and texts you the moment it's approved.
What inspections does a temporary power pole (t-pole) need?
Typically: Temporary service inspection, Utility release. PullPermits.ai books the inspection with Gwinnett County for you once the permit is issued.
Anything specific about filing a temp power in Gwinnett County?
Gwinnett exposes a native 'Electrical Only' online permit type — fast when it fits. PullPermits.ai has the Gwinnett County temp power process encoded, so the right form and any affidavit or account step is handled.
Why do temporary power pole (t-pole) permits get rejected?
The most common reasons: Pole/meter height or grounding not to spec; Filed under the wrong permit type; Not paired with the required general electrical permit. PullPermits.ai checks for these before it files, so you don't lose a day to a kickback.

Keep exploring

Working a job somewhere else? Find your jurisdiction by address or read the temp power permit guide.

File your Gwinnett temp power permit the easy way

Join the waitlist and let PullPermits.ai draft and file your Gwinnett County temporary power pole (t-pole) permit. Review the preview, tap approve — we handle Accela Citizen Access (ACA) and the fee at cost.

We’ll only email you about PullPermits going live in your area. No spam.

Try the live demoThis is an interactive demo on sample data. Nothing is really filed.